Site: Montefiore Medical Center

As a member of the MEP team, GC Eng & Associates supported a renovation of the existing cafeteria, which necessitated upgrading the existing MEP systems for all effected spaces. The renovation also involved raising the roof and ceiling to add a mezzanine level to the existing 15,000 square feet cafeteria and other adjacent medical facilities.

​

HVAC designs included:

​

  • Detailed surveys of the existing space to allow our firm to precisely design MEP replacement work for optimal cost

  • Replacing existing air handling units with new units

  • Designing supplemental chillers to alleviate main chiller plant loads

  • Designing an innovative scheme to use return CHW as a heat rejection medium, sequenced using proper DDS controls systems

  • Designing replacement of 100%-OA make air units for existing kitchens

  • Designing replacement of laboratory / critical exhaust systems

​

The project also involved designing electrical, plumbing, and fire protection systems and a nursing call system. The firm also worked on the layout and specifications of an IT cabling system for all MEP trades.

Project: Renovation of Cafeteria and PBX Center

Project: Renovation of Emergency Department

GC Eng & Associates renovated the 15,000 square feet Emergency Department in a multi-phased construction project. The department's complete upgrade included triage, surgery, CT scans, a hazardous disease isolation suite, and other related hospital services, fully compliant with Article 28 and NYS-DOH inspections.  

​

HVAC designs included:

​

  • Detailed surveys of the existing space to allow our firm to precisely design MEP replacement work for optimal cost

  • Replacing existing air handling units with new hospital grade systems

  • Designing isolation suite/hazardous exhaust system

 

The project also involved designing electrical, plumbing, and fire protection systems and a nursing call system. The firm also worked on the layout and specifications of an IT cabling system for all MEP trades.

Site: Saint John’s Episcopal Hospital

Cost: $10,000,000

Cost: $2,000,000